Go To Search
Permit Fees
Fees will be doubled if permit is issued after work begins.

Residential Fees
  • First $1,000 Construction Fee (new building) = $150
  • Each Additional $1,000: $15
  • First $1,000 Construction Fee (alteration) = $150
  • Each Additional $1,000: $10

Commercial Fees
  • First $1,000 (new or alteration) Construction Fee: $300
  • Each Additional $1,000: $15

A $150 letter of completion fee must be added to all Building Permit Applications (except for fences and roofs).

Fences
  • New: $.75 per linear foot
  • Replacement $.75 per linear foot

Outdoor Decks & Balconies
  • $48 per square foot to ascertain cost of construction, then, use Residential Fee for cost of the permit.

Pools
  • Above Ground Pool: $150
  • In-Ground Pool: $300
  • Certificate of Occupancy: $150
  • Temporary C.O.: $300
  • Amend Duplicate C.O.: $75
  • Letter of Completion: $150
  • Letter in Lieu: $113 (Must put written request in for Letter in Lieu. An inspection is required and an electrical survey must be submitted before the letter can be issued.)

Plumbing Permits
  • New Construction / Alteration: $90 (for the first five fixtures)
  • Additional Fixtures: $7.50
  • Gas Test / Gas Burner / Stove: $60
  • Gas Water Heater: $60
  • Gas Unit Heaters: $7.50

Demolition Permits
  • Frame Residence: $300
  • Frame Commercial: $600
  • Frame Accessory: $150
  • One-Story masonry: $225
  • Sign Permit: $150
  • Sign Renewal: $150
  • Electric Permit: 30

A $150 letter of completion fee must be added to all Demolition Permit Applications.

Rental Permit Fees
  • One Rental Unit: $150
  • Two Rental Units: $225
  • Three Rental Units: $262
  • Four Rental Units: $287
  • Each Additional Unit in Excess of Four: add $20 (Fee not refundable)

Air Conditioning / Refrigeration / Heating
  • Residential: $75
  • Commercial: $150 per unit plus $7.50 per $1,000 cost of construction or fraction thereof for piping, radiators, and duct work.
  • Oil Burner / Oil Tank / Hot Water Heater: $75 (install / remove)
  • Installation of storage tanks for flammable liquids: $300 for first tank
  • Each additional tank installed on the same site at the same time: $150
  • Storage tanks (non-flammable): $75 (install / remove)

Bulkhead Fees
*Refacing or resurfacing bulkheads is no longer permitted.
  • New Bulkhead / Add / Replace: $300 for the first 50 fee and $1.50 each additional foot
  • Float, Ramp, and Platform: $150 each (Includes docks, piers, and boardwalks)
  • Poles / New / Replacement / Relocate: $38 per pole
  • Tie Rods: $38
  • Finger slips $150 per slip